|
Technology Environment: Visibility / AutoCAD
How do you cut your lead time from 36 to 16 weeks on custom designed and very complex products? Through a combination of process streamlining and focused application software. This prominent manufacturer of high-quality elevator and escalator systems has ramped up Product Configurator applications to generate Bills of Material, as well as drawings of these complex configured products. The company is saving about $600,000 of engineering time per year through a combination of the Configurator and AutoCAD.
According to this company: "Configurator has become the heart and soul of our engineering process."
For elevators, which have 1,500-2,000 parts, Product Configurator identifies all mechanical, electrical and fixture components and assemblies. The order-through-engineering process that once took eight to 12 weeks is now down to two to three weeks through a combination of process streamlining and automation. |